国产精品视频在线观看,奶大交一乱一乱一高潮,国产裸体无遮挡永久观看,四川一级毛片在线播放

Strengthening

Location:Home>Strengthening

Structure monitoring system of Chongqing Nanji Gate rail bridge
2024-07-04 11:32:00

 Nanji Gate Rail Bridge is the first large-scale use of steel spring floating plate ballast in China. When the train passes over the bridge at high speed, the integral ballast of the steel spring floating plate can not only reduce the noise of the train, but also reduce the vibration of the bridge floor. The monitoring system monitors the vibration, main beam stress and environmental load of the bridge in real time.  


111.jpg 

Chongqing Nanji Gate rail bridge